| LOCATION: |
From Sawgrass Exwy (SR 869) Mile Post 1.71 To Mile Post 3.046 |
| OWNER: |
FDOT Turnpike Enterprise Construction |
| ARCHITECT: |
|
| CONSTRUCTION COST: |
$ 25,985,574 |
| START - COMPLETION: |
11/2006 - 9/2008 |
| DESCRIPTION: |
The proposed improvements include the construction of a double-span SunPass Gantry, with Equipment Building, to the south of the existing Sunrise Mainline Toll Plaza. Modifications to the existing toll plaza in order to permit this construction shall |
|
Aerial Shots of Sunrise Toll Plaza
|